From 50-story new construction to occupied-building retrofits and federal facilities — a sample of the mechanical work behind the name.
New Construction & Design-Build

Missonia BAIA
Miami
Full mechanical equipment, ductwork, piping, life-safety, and controls for a new-construction 50-story high-rise condominium.

Surf House Residences (Four Seasons Residences)
Surfside
Complete mechanical for a new-construction high-rise, including VRF systems, outside-air units, life safety, ductwork, controls, and finishes.

830 Brickell
Miami
Mechanical tenant-improvement scope across six complete floors — VRF, ductwork, controls, and finishes.

Emerald Hills Office Park
Hollywood, FL
Complete turnkey MEP design-build renovation of a 6-story office building — water-cooled heat-recovery VRF, ducted and ductless units, controls, fast-track installation.

Novotel Miami Brickell
Miami
Complete mechanical installation and commissioning of VRF systems, ductwork, and garage CO monitoring.
Hotels & Hospitality

One Hotel & Condominiums
South Beach
Complete mechanical renovation of 268 condominiums and 344 hotel rooms — new and rebuilt 1,000-ton chiller, controls, chilled-water fan coils, ductwork, and life-safety systems.

Shelborne Hotel
Miami Beach
New chillers, outside-air units, common-area AHUs, and 300 guest-room fan coils for a complete hotel retrofit.

The Hall South Beach Hotel
Miami Beach
Complete MEP installation and commissioning of VRV heat-pump systems, controls, and retrofit ductwork for a 166-room historic hotel renovation and expansion.
Condominiums & Life Safety

L'Hermitage Condominium
Fort Lauderdale
High-rise life-safety upgrades: stairwell pressurization, corridor exhaust, fire/smoke damper replacements, and ventilation modifications.

Imperial House Condominium
Miami Beach
Turnkey CO/NO₂ garage ventilation retrofit — VFD upgrades, gas detection, alarms, recirculation fans, and full programming and commissioning.

Continuum on South Beach
Miami Beach
Coastal-rated garage exhaust and recirculation fan replacement with integrated CO/NO₂ sensors, VFD controls, and commissioning.

South Pointe Tower
Miami Beach
Condenser water riser replacement and rooftop retrofit, plus 100% outside-air unit replacement with structural modifications.

Sea Ranch Club Condominium
Lauderdale-By-The-Sea
Condenser water riser replacement across 16 risers with rooftop piping retrofit in an occupied building, plus common-area heat pump replacement.

Villa Magna Condominium
Highland Beach
Complete building ventilation upgrade — rooftop DOAS replacement, ductwork and fire dampers, boiler replacement, and new pump skid.

Ocean Two Condominium
Sunny Isles Beach
Cooling tower replacement with temporary tie-in, crane lift and rigging, new tower installation, and piping and electrical reconnection.

Downtown Dadeland Condominium
Miami
Removal and replacement of hot-water plant — six 200-gallon tanks with new piping, valves, and permitted drawings.
Government & Institutional

Embassy of the United States
Managua, Nicaragua
Long-term HVAC and solar maintenance program covering chillers, VRF, a 1-megawatt solar array, and electrical systems.

Homeland Security Headquarters
McAllen, TX
Prime contractor for an occupied border-patrol facility retrofit — HVAC, electrical, structural, and civil.
Planning a project?
From pre-construction budgeting to commissioning — talk to our team.
